Little Creatures Tank Capacity Upgrade
Client: Little Creatures Geelong
Scope: Remediation works to prepare for new drainage system
Dundee Rock conducted comprehensive civil and soil remediation works to prepare for the installation of a new drainage system. This involved excavating contaminated soils, properly managing and disposing of hazardous materials, and ensuring a stable foundation for the new drainage infrastructure. The team worked diligently to ensure safety and compliance with all environmental regulations, minimising disruption to ongoing operations and maintaining the project schedule. This thorough approach laid the groundwork for a reliable and efficient drainage system, crucial for the site's future development and functionality
Construction of 240m2 Structural Concrete Slab
Construction of 8x Plinths to site 80,000L Tanks
Installation of in ground trade waste drainage
Installation of Blucher SS Grated drainage.
Installation of Trade waste holding pit and pump station
Modification to Access and Egress point in line with approved Building permits
Manufacture and Install handrail system and maintenance gates.
Install Epoxy/Polyurethane concrete coating